The tracks were converted into standard gauge in 1962.
The remaining track was pulled up and converted into walking trails.
The track was converted later into a walking and cycle path.
These tracks were converted to standard gauge in 1881.
In 1994 the tracks were removed and converted to a now very popular cycle track.
The track was converted to standard gauge on 21 May 1892.
In around 2004, a fifth track was converted to passenger use.
The track was largely converted into a walking and bicycle trail.
The track was closed and converted to a shopping plaza.
The old track has now been converted into a cycle route.