Dodatkowe przykłady dopasowywane są do haseł w zautomatyzowany sposób - nie gwarantujemy ich poprawności.
There is also a bus stop outside the cargo terminal.
Then he slowed some more and turned down a side road toward a cargo terminal.
The current use of the cargo terminal does not exceed 30%.
The station also has a cargo terminal with several tracks.
Plans have been announced to construct a new cargo terminal.
The cargo terminal was also expanded in the second phase.
It is the largest cargo terminal by both size and capacity within the airport.
A new air cargo terminal was built as well.
Plans for development in 2007-2013 include extending the runway and building a cargo terminal.
In the 1990s the air cargo terminal and parking facilities were made bigger.
A cargo terminal is also planned for the future.
A new logistics center and a large cargo terminal are currently under construction.
Plans for a separate cargo terminal was also announced.
Once on the ground it taxied to the cargo terminal at the small airport.
Report our position on the field as the Avgroup cargo terminal, not this location.
In 2001, the airport installed jet bridges and a cargo terminal.
Construction of a cargo terminal is the next big step planned by Infraero.
The Cargo Terminals have expanded in the last 13 years.
There are one passenger terminal and four cargo terminals at the airport.
The cargo terminal of the sea port is to be moved from the Sochi centre.
A new US$15 million dollar cargo terminal was also constructed.
The present terminal will be converted into an international cargo terminal.
A new cargo terminal has also been proposed.
It now functions as a main freight cargo terminal.
On 23 September 1999, a centre for flowers, fruits and vegetables was commissioned at the cargo terminal.